Concrete Driveways in Birmingham

One slab of air-entrained concrete, brushed or tamped for grip, that a car, a van and a Birmingham winter cannot shift. We price it the same working day from published 2026 rates, sort the drainage and dropped-kerb questions first, and arrange the work through a vetted local installation partner.

What you're buying

A Plain Concrete Driveway, Done Properly

A poured concrete driveway is one continuous slab — typically 100–150mm of air-entrained C25/30, the mix the trade calls PAV1, over 100–150mm of compacted MOT Type 1 — with a brushed, tamped or exposed-aggregate finish and control joints sawn in so that the shrinkage every slab goes through cracks where you cannot see it. No blocks to sink, no joints for weeds, no sealer to keep up unless you want one.

Built like that it is the longest-lived surface you can put on a drive: Checkatrade's Birmingham guidance quotes 30 to 40+ years. It is also the plainest. If you want colour and a stone or cobble pattern, that is imprinted concrete, a different page and a slightly different mix.

The concrete matters more than the finish. A drive is wet and frozen for a good part of every Birmingham winter, so the mix is air-entrained — a minimum 4.5% of microscopic air bubbles that give freezing water room to expand — the whole difference between a plain C20 slab that flakes a little more each spring and a PAV1-equivalent slab that does not. The mix and the 150mm depth maths are on our concrete for driveways page.

What the quote should say

Dig-out depth · 100–150mm compacted MOT Type 1 in layers · membrane · 150mm air-entrained C25/30 (PAV1-equivalent) for cars and vans, 100mm minimum for a light-use drive · A142 mesh on chairs where specified · control joints at about 30 times the slab depth · falls and a drainage channel or soakaway · edge restraint · who removes the spoil. If a line is missing, ask why.

Finishes

Brushed, Tamped, Floated or Exposed Aggregate

The finish is decided in the last hour of the pour and is mostly a question of grip: Pavingexpert's advice, which our partners follow, is light brush strokes across the direction of travel.

FinishHow it is doneWhere it suits2026 guide
BrushedA stiff broom drawn across the wet surface at right angles to the direction you driveThe default for a domestic drive: grip without looking like a yardWithin the £85–£125 per m² band
TampedA timber or steel beam bounced along the surface, leaving parallel ridgesSteeper drives and shared accesses where grip matters more than looksWithin the band
Steel-floatedTrowelled smooth once the bleed water has goneGarage floors and covered areas; too slippery for an open driveWithin the band
Exposed aggregateThe surface mortar is retarded and washed off to show the stoneA more decorative slab that hides tyre marksMyJobQuote lists it at £70–£100 per m²; expect a premium line on the quote
ColouredPigment through the mix, or a surface hardener floated inBuff, sand or charcoal instead of greyAdds £15–£25 per m²
The job

How a Concrete Drive Is Built

1

Survey and price

Measurements, levels, what is there now, whether a dropped kerb is needed and where the rainwater goes. A written, itemised quote from the installation partner with the depths and the mix on it.

2

Excavate

The old surface comes out and the ground is dug to around 250–300mm for a 150mm slab on 100–150mm of stone. Spoil goes in a skip (£240–£550 in 2026).

3

Sub-base and membrane

MOT Type 1 compacted in layers of no more than 75mm, then a membrane. This is the layer that stops a drive settling on Birmingham's clay; 50mm of loose stone is where cheap drives fail.

4

Forms, falls, mesh and edges

Edge forms are set to the drainage design. Where specified, A142 mesh sits on chairs with 50mm of cover (A252 on a thicker slab taking vans), and the edges are thickened where the slab meets soft ground.

5

Pour and finish

The air-entrained mix is batched on your street by a volumetric truck, so the drive gets exactly the volume it needs and no water is added to make it flow. It is placed, tamped to the falls and brushed.

6

Joints, cure and use

Control joints sawn at about 30 times the slab depth, a quarter to a third of the way through. Kept damp in summer, covered against frost in winter. Nothing on it for 48 hours; cars after 7–10 days; full strength at 28 days.

2026 prices

What a Concrete Driveway Costs in Birmingham

MyJobQuote's September 2026 guide puts a plain concrete drive at £85–£125 per square metre installed — materials £50–£75, labour £33–£55 — and Checkatrade's April 2026 table works to about £95 per m². The Checkatrade listing for Birmingham puts the typical local job at £2,829–£5,504. Bigger drives cost less per metre because the set-up and the skip spread further.

Drive sizeTypical useConcrete at 150mm2026 guide total (installed)Days on site
20m²Single car, terrace frontage3m³£1,800–£2,6002
30m²Two cars, typical 1930s semi4.5m³£2,500–£4,0002–3
40m²Two cars plus a path6m³£3,400–£5,2003–4
60m²Wide frontage, three or four cars9m³£5,000–£7,5003–5

Ranges built from the 2026 MyJobQuote and Checkatrade guides (Checkatrade's own table gives £2,300 for 20m² and £4,750 for 50m²); your partner's written quote is the price. What moves it:

  • Breaking out the old drive — £500–£2,000 depending on what it is and how many skips it fills.
  • Groundworks and extras — groundworks £20–£100 per m² depending on what is underneath; mesh £10–£20 per m²; edging £15–£40 per linear metre.
  • Drainage — a channel and soakaway, or a connection to the roof-water drain on clay, is the difference between a lawful drive and a planning application.
  • A new dropped kerb — the council's £125 application fee and £375 administration fee, plus construction priced after inspection.

Concrete only? That 30m² drive at 150mm is 4.5m³ — roughly £520–£580 plus VAT of air-entrained mix, batched on your street and metered; check your dimensions with the concrete calculator. The labour-versus-materials split and how to read a quote are in our concrete driveway cost guide.

The rules

The 5m² Rule and Birmingham's Dropped Kerbs

Since 1 October 2008, covering more than 5 square metres of front garden with an impermeable surface needs planning permission unless the rainwater is directed to a lawn, border or soakaway inside your boundary. Plain concrete is impermeable, so every drive our partners lay is designed around that sentence: fall the slab to a planted area, run a channel along the low edge to a soakaway, or — on clay, where soakaways drain slowly — connect that channel to the roof-water drain. Water across the pavement is, in the council's own words, illegal.

If you will drive over the footway you also need a vehicle crossing, built only by Birmingham City Council's authorised contractors: a £125 non-refundable application fee, a £375 administration fee and construction priced after inspection (April 2026 figures), a quote within 28 working days and installation at least 16 weeks from payment. The council needs a hardstanding at least 4.75m deep with its drainage in place before it will build the kerb, and refuses drives steeper than 1 in 10 or next to a healthy or protected tree. So the order is drainage design, drive, then kerb; in one of Birmingham's 29 conservation areas or on a classified road, check with planning first. The full process is in our driveway rules and dropped kerbs guide.

Timeline

Day by Day, Then the Waiting

For a typical 30m² drive with an old surface to remove; Checkatrade's Birmingham guidance says 2–4 days on site plus 7–10 days of curing before you park.

  • Day 1 — break out and dig, spoil into the skip, sub-base compacted in layers, forms set to the falls.
  • Day 2 — membrane and mesh, the pour from the volumetric truck, tamping and brushing; joints sawn as soon as the slab can take a saw.
  • Day 3 — forms struck, edges finished, drainage channel connected, site cleared. Nothing on the slab for the first 48 hours.
  • Then — walk on it after 24–48 hours, no heavy loads until day 5, park after 7–10 days, full strength at 28 days.

Weather sets the calendar. Ready-mixed concrete should not be delivered below 5°C or left to drop below it while it gains strength, so a winter slab is covered and the curing times stretched; in a hot spell the risk is plastic shrinkage cracking, so the slab is kept damp and the pour timed for the cool part of the day. A partner who postpones your pour because of the forecast is looking after your drive.

Alternatives

When Concrete Beats Block Paving, Resin and Tarmac

Surface2026 guide per m² installed50m² two-car drive (Checkatrade, April 2026)Where it wins
Plain concrete£85–£125 (Checkatrade: £95)£4,750Vans and heavy use, slopes, lowest upkeep, 30–40+ years
Block paving£100–£150 (Checkatrade: £100)£5,000Permeable blocks avoid a drainage design; a section can be lifted; weeds and sinking are the cost
Resin bound£90–£140 (Checkatrade: £120)£6,000Looks and permeability; only as good as the base underneath it
Tarmac£60–£90 (Checkatrade: £90)£4,500Cheapest on a large area; softens in heat and marks under tyres

Per-metre ranges from the 2026 Checkatrade, MyJobQuote and BookaBuilderUK guides. Concrete is the answer when the drive takes a van, when it slopes and when you want to forget about it for thirty years; the one thing it will not do is drain through itself. Block paving is the answer when you want the surface to be the drainage; resin when the look is the point. The longer comparison is in imprinted concrete vs block paving vs resin.

Local ground

Birmingham Front Gardens, Clay and Water

Around 30% of Birmingham's homes are interwar — 106,000 of them — and the 1930s semi with a bay window and a front garden is exactly the house whose lawn is now becoming a drive. In Perry Beeches the neighbourhood plan proposed discouraging paved-over front gardens because of the flooding that followed; the flash floods of 27 August 2026 made the same point across the city. The drainage design on this page is not paperwork.

Under those gardens is clayey glacial till to the south-west, sandier drift to the east, and beneath both Mercia Mudstone whose top metre or two behaves as shrinkable clay, swelling in wet winters and shrinking in dry summers. A slab on a skim of stone will rock and crack at the first dry August; 100–150mm of compacted Type 1 will not. Our installation partners work across the city and the West Midlands, including Sutton Coldfield, Solihull, Wolverhampton, West Bromwich, Halesowen and Lichfield.

Two ways to buy

Supply and Lay, or Supply Only

Supply and lay: tell us the size, the postcode and the finish you want, and we price the whole job from the rates above, then arrange it through a vetted local partner who surveys, quotes in writing and does the work. Installed work is carried out by a vetted local partner; you'll be told who is attending before the job is booked.

Supply only: if you already have a contractor, our delivery partners batch the air-entrained PAV1-equivalent mix on your street and meter what is poured — see concrete for driveways, order from 0.5m³ through mini mix, and add a pump if the truck cannot get close. Related: imprinted concrete driveways for colour and pattern, repair and resealing if the existing slab can be saved, garage bases on the same visit, and the full list of installed concrete services.

Quick answers

Concrete Driveway FAQs

How much does a concrete driveway cost in Birmingham?

As a 2026 guide, a plain brushed or tamped concrete drive runs £85–£125 per square metre installed, so a two-car 30m² drive is typically £2,500–£4,000 and a 60m² frontage £5,000–£7,500; Checkatrade's Birmingham listing puts the typical local job at £2,829–£5,504. Removing an old drive adds £500–£2,000 and a dropped kerb is priced separately by the council. Your partner's written quote is the price.

How thick should a concrete driveway be?

At least 100mm for a light-use drive, and around 150mm on a compacted 100–150mm Type 1 sub-base for anything that takes a van or a regularly parked family car, which is the guidance our driveway concrete page follows. A 150mm slab uses half as much concrete again as a 100mm one, so the quote should state the depth; a quote for 75mm is a path, not a drive.

Brushed or tamped — which finish should I choose?

Brushed for most drives: a stiff broom drawn across the direction of travel gives grip in the wet without looking like a yard. Tamped leaves deeper ridges and suits steeper drives and shared accesses. A smooth steel-floated finish belongs on garage floors; on an open drive it is slippery when wet. Whatever the finish, air-entrained concrete must not be power-floated.

Do I need planning permission or drainage for a concrete driveway?

Plain concrete is impermeable, so a front-garden drive over 5m² needs planning permission unless the rainwater is directed to a lawn, border or soakaway inside your boundary. The usual answer is a fall to a planted area or a channel along the low edge to a soakaway — on Birmingham clay, often connected to the roof-water drain. Water across the pavement is illegal in the council's words, and it will not build a dropped kerb until the drainage is in.

How long before I can walk and park on a new concrete driveway?

Nothing on it for the first 48 hours, walk on it after 24–48 hours, and keep cars off for 7–10 days. Concrete reaches its design strength at 28 days, so no heavy vehicles, skips or turning the wheels on the spot in the first month. In cold weather the partner will extend those times, because concrete gains strength slowly below about 5°C.

Will a concrete driveway crack?

Every slab shrinks a little as it cures, so control joints are sawn at roughly 30 times the slab depth — about every 3m on a 100mm slab and 4–5m on a 150mm one — so the cracking happens in the joint where you cannot see it. Cracks anywhere else usually mean missing or late joints, a thin slab, a poorly compacted sub-base or water added on site, which is why we want all four written on the quote.

Is concrete cheaper than block paving or resin?

Usually. Checkatrade's April 2026 table puts a 50m² two-car drive at £4,750 in concrete against £5,000 in block paving and £6,000 in resin bound, with tarmac at £4,500 and gravel at £3,000. Concrete also lasts longest, 30 to 40+ years, and needs the least upkeep. Block paving wins if you want a permeable surface without a drainage design; resin wins on looks; tarmac wins only on a very large area.